Technology & Innovation Dynamics

Management of technology: how technologies and the firms behind them actually evolve, compete, and win, each idea tied to the literature and, where we have one, a case.

Illustrated title card: on the left an inventor at a workbench works on a prototype device with tools and a schematic; three early product experiments (a radio, a smart speaker, a smartwatch) feed by arrows into a central phone with a learning curve and puzzle pieces below it; on the right a network of connected users, a factory, a shop and an institution show the innovation spreading through the world.

How does a technology itself evolve, how do firms compete to shape and own it, and what decides whether an innovation displaces the incumbent or dies in the attempt? These are the questions of the management-of-technology and innovation-studies literatures.

Read alongside the economics of transitions and the human side of technology.


1. The shape of technological change

The technology S-curve

A technology improves slowly at first, then rapidly as effort compounds, then slowly again as it approaches physical limits. Performance plotted against effort or time traces an S. Foster (1986) made the S-curve a tool of technology strategy: the incumbent riding a maturing curve is most vulnerable exactly when its technology looks most refined, because a new technology on a younger, steeper curve is about to overtake it. Reading which curve a technology sits on, and how much room it has left, is the first question of technology management.

Chart titled 'Two technology S-curves'. Coral curve for the maturing incumbent rises early and plateaus. Blue curve for the younger technology starts later, rises steeply and crosses the coral curve at a point labelled 'overtake'. A dashed annotation on the blue curve above the crossing reads 'room left to improve'. Axes: performance against effort and time.

Dominant design

Early in a technology's life, many rival designs compete; then the market converges on one configuration that becomes the reference every competitor must adopt. Utterback and Abernathy (1975); Abernathy and Utterback (1978) named this the dominant design, and showed that its emergence flips the basis of competition from product innovation to process and cost. Before the dominant design, the game is invention; after it, the game is efficiency. Much of a transition's turbulence is the fight to set the dominant design, because whoever sets it shapes the market that forms around it.

Left side labelled 'product experimentation', with five different early product designs (a radio, a canister, a microwave, a clock, a lamp) each drawn in a different colour, feeding by lines into a central box labelled 'dominant design'. From that box, an arrow leads right to a row of four identical radios on a production line, under the label 'process and cost', with a downward arrow indicating declining unit cost. A dashed line beneath the dominant-design box reads 'the basis of competition changes'.

The fluid, transitional, and specific phases

The Abernathy-Utterback model divides an industry's life into phases: a fluid phase of rapid, uncertain product experimentation; a transitional phase as a dominant design emerges; and a specific phase of incremental, cost-focused process innovation. Knowing which phase a technology is in tells you what kind of competitor wins, the agile experimenter early, the efficient scaler late, and warns when the rules are about to change.

Chart titled 'How the basis of innovation changes'. Three vertical bands across the x-axis labelled fluid, transitional, specific. A coral product-innovation curve is high and oscillating in the fluid phase, then declines. A blue process-innovation curve is low in the fluid phase, rises through the transitional phase and plateaus high in the specific phase. The curves cross at the boundary of the transitional band, marked as 'dominant design'. Bottom labels: many designs, convergence, scale and efficiency. Axes: high to low intensity against industry maturity.

Radical versus incremental innovation

Innovation ranges from incremental improvements that reinforce existing competences to radical breaks that render them obsolete. The distinction matters because incumbents are structurally good at the first and structurally bad at the second: their skills, suppliers, and customers all pull toward the familiar. Most failed transitions are radical innovations judged by incremental standards.

Two panels side by side. Left panel labelled 'incremental innovation', yellow header, showing a green factory refined step by step across five iterations with dots down to icons for gear, chip, sparkle, leaf and dollar; footer band reads 'reinforces existing capabilities'. Right panel labelled 'radical innovation', coral header, showing the same green factory on the left, an X marked 'competence destroyed' at midpoint, and a new 3D-printer beside it; three green worker/warehouse/team icons on the left of the X and three coral counterparts on the right; footer band reads 'renders existing capabilities obsolete'.

Architectural innovation

An innovation can leave every component unchanged and still destroy an incumbent, if it changes the way the components are linked. Henderson and Clark (1990) showed that this architectural innovation is peculiarly deadly because incumbents, whose knowledge is organised around the old architecture, often fail even to perceive it as a threat. It looks like a minor rearrangement and is in fact a redefinition. Many transitions are architectural: the pieces are familiar, the system is new.

Two labelled panels side by side. Left panel 'old architecture': four coloured blocks battery, motor, controller, chassis arranged as a square with a full ring of connections. Arrow between panels. Right panel 'new architecture': the same four coloured blocks re-linked around a central controller in a hub configuration, with different connections. Caption beneath: components unchanged, relationships redefined.

Path dependence in technology

The trajectory a technology takes is shaped by the small, early, sometimes accidental choices that got locked in, so history, not just merit, determines which design prevails. This is the innovation-dynamics reading of Arthur (1989) and David (1985) (treated as an economic result on the economics page): here the emphasis is strategic, that an early lead in a path-dependent technology is worth fighting for out of proportion to its immediate value, because the path, once set, is hard to leave.

Technological paradigms and trajectories

Technical progress does not explore every possible direction; it follows a paradigm, a shared sense of what the relevant problems are and how to solve them, and advances along the trajectories that paradigm defines. Dosi (1982) drew the analogy to Kuhn's scientific paradigms: a paradigm acts as a lens that focuses effort on some avenues and makes others nearly invisible, which is why breakthroughs so often come from outside the incumbent's field of view. For a transition, the paradigm is the deep reason an industry keeps improving the wrong thing, refining the combustion engine while the problem quietly becomes the powertrain, and why genuine change usually requires a paradigm shift, not just harder work along the existing trajectory.

Diagram: a factory on the left projects a yellow spotlight beam to the right, labelled 'the problems the paradigm can see'. Inside the beam, four combustion engines evolve step by step from left to right through 'efficiency' and 'refinement' toward an arrow labelled 'paradigm shift'. Outside the beam, in the darker area beneath it, an alternative path of battery to electric motor sits with an arrow labelled 'the alternative outside the field of view'. Caption beneath: a paradigm directs attention before it directs investment.

General purpose technologies and the productivity paradox

Some technologies, steam, electricity, the computer, are not single innovations but platforms that reshape every sector they touch, and their gains show up slowly, because the economy has to reorganise around them first. Bresnahan and Trajtenberg (1995) named these general purpose technologies; David (1990) showed, through the example of the electric dynamo, that the productivity payoff can lag the invention by decades while factories, skills, and institutions are rebuilt around it. The lesson for a transition is patience with a twist: the absence of measured gains in the early years is not evidence the technology has failed, it is evidence the complementary reorganisation has not happened yet.

Chart titled 'The productivity payoff arrives late'. A lightbulb labelled 'invention arrives' sits at the left of a horizontal timeline. A wide yellow band across the middle of the timeline labelled 'complementary reorganisation' contains four icons: processes, skills, organisations, institutions. A coral line labelled 'measured gains remain small' runs flat across the band, then bends sharply upward at the far right as 'productivity appears'. Caption beneath: the technology arrives before the economy is ready to use it.

2. Competition, dominance, and disruption

Disruptive innovation

An innovation that is worse on the metrics incumbents value, but better on a new dimension (cheaper, simpler, more accessible), can take root in a low-end or new market the incumbent ignores, then improve until it displaces them from above. Christensen (1997) formalised this, and the key insight is counter-intuitive: incumbents fail not because they are badly managed but because they are well managed, listening to their best customers is exactly what makes them miss the disruption. The Lab reads this pattern in emerging-market technology, where the "worse" product that serves the underserved is often the one that scales.

Chart titled 'Sustaining and disruptive trajectories'. Coral line labelled 'sustaining innovation' rises gently across the top. Two dashed lines below it bracket a band labelled 'what existing customers demand'. A blue S-curve labelled with the disruptive path begins in a shaded blue rectangle at bottom-left labelled 'new or underserved market' with a start-dot marked 'worse on incumbent metrics', then curves up steeply and crosses the customer-demand band at a marked dot labelled 'displacement becomes possible'. Axes: performance against time.

Sustaining versus disruptive trajectories

Not every threat is disruptive. Sustaining innovations, even dramatic ones, improve a product for existing customers, and incumbents almost always win those. Disruptive innovations change who the customer is and what "good" means. Misclassifying a threat, treating a disruption as a sustaining challenge, or panicking over a sustaining one, is a common and costly strategic error.

Network effects and standards battles

When a technology's value to each user rises with the number of other users, competition tends toward a single winner, and the contest becomes a standards battle fought over installed base and compatibility rather than product quality. Katz and Shapiro (1985) formalised network externalities (treated on the economics page as a market-structure result); in innovation strategy the lesson is that timing, sponsorship, and compatibility choices can matter more than being best. We examine who controls a standard, and therefore the market around it, in Who Holds the Pen on the Standard.

Creative destruction

New combinations do not add to an economy so much as replace what came before, so innovation and disruption are one process seen from two sides. Schumpeter (1942) named the "perennial gale of creative destruction." For technology management it is the founding fact: competitive advantage is temporary by construction, and a firm's task is not to defend a position but to keep generating the next one.

First-mover advantage, and its limits

Moving first can secure a lead through learning, network effects, and pre-emption, or it can mean bearing the cost of educating a market that a fast follower then captures. Whether the pioneer or the follower wins depends on the appropriability regime and the pace of change, which is why "first" is a strategy, not a guarantee.

Two parallel paths ending at a shop labelled 'early position'. Top path labelled 'first mover': a coral bulldozer clears a dashed path past three milestones marked 'technology risk', 'market education', 'infrastructure', then arrives at the shop under an orange flag. Bottom path labelled 'fast follower': a blue car drives on a paved dashed road past three milestones marked 'observed demand', 'lower uncertainty', 'faster scaling', arriving at the same shop. Beside the shop a footer reads 'market leadership is not guaranteed'. Caption beneath: moving first creates options and costs.

Innovation ecosystems and co-innovation risk

A firm's own innovation can be excellent and still fail commercially if the other innovations it depends on, the complements, the infrastructure, the partners upstream and downstream, are not ready. Adner (2006) called this the "wide lens": the innovator's real risk is often not execution but the readiness of the ecosystem around it, and the more partners a promising technology needs, the more ways it can be held up by the slowest of them. Electric mobility is the textbook case: a good vehicle is not enough if the charging, the financing, the mechanics, and the grid are not ready together. Reading the whole ecosystem, not just the product, is what separates a technology that could work from one that will.

Four horizontal arrows extending to the right toward a door labelled 'commercial launch' with an electric motorbike behind it. Each arrow is labelled at its left end: charging, finance, mechanics, grid. The first three arrows reach the launch line; the grid arrow is shorter and continues as a dashed line, marked 'co-innovation risk'. Caption beneath: the slowest complement sets the launch date.

3. Firm capability and strategy

Profiting from innovation (appropriability and complementary assets)

Inventing something valuable and capturing the value from it are different problems, and the second is usually harder. Teece (1986) showed that whether the innovator profits, rather than an imitator or a supplier, depends on the strength of the appropriability regime and on who controls the complementary assets: the manufacturing, distribution, brand, and qualification needed to bring the innovation to market. This is the single most useful frame in technology strategy, and it explains why the inventor is so often not the one who gets rich. We apply the make-or-buy version to network architecture in Own the Battery, Rent the Shopfront.

Diagram titled 'Inventing value is not the same as capturing it'. A scientist with a lightbulb labelled 'innovation' sits at the far left, with a small coin stack below labelled 'who controls the route to market?'. Arrows lead right through four yellow tiles: manufacturing (factory), qualification (certified rosette), distribution (warehouse and truck), market access (network of figures). Rising coin stacks above each tile show the value building. A bracket beneath the middle four tiles reads 'complementary assets'. A final arrow leads to a forest labelled 'value captured'.

Dynamic capabilities

In a fast-changing environment, what matters is not a firm's current resources but its ability to sense change, seize opportunities, and reconfigure itself in response. Teece, Pisano, and Shuen (1997) called this bundle of higher-order abilities dynamic capabilities, and it is why some firms survive successive transitions while others, equally strong at any single moment, do not. A transition is precisely the environment where dynamic capability, not static advantage, decides who is left standing.

Three coloured circles arranged in a loop with arrows connecting them: sky-blue 'sense, recognise change' at top-left, coral 'seize, commit resources' at top-right, forest 'reconfigure, change the organisation' at the bottom. A small firm icon labelled 'dynamic capability' sits at the centre. Caption beneath: advantage is the ability to change, not the resources held today.

Absorptive capacity

A firm's ability to recognise the value of new external knowledge, assimilate it, and apply it depends on how much related knowledge it already has, so the capacity to learn is itself cumulative. Cohen and Levinthal (1990) named this absorptive capacity, and it explains why a country or firm cannot simply buy its way into a frontier technology: without the prior base, the new knowledge cannot be absorbed. It is the deep reason capability is slow to build, explored in the field in Capability Is the Slow Part.

Diagram titled 'absorptive capacity is cumulative'. Left column shows a knowledge document falling off a broken edge and coming to rest below with the note 'knowledge cannot be absorbed'. Right side shows a rising staircase of four coloured steps labelled 1 related knowledge, 2 recognise value, 3 assimilate, 4 apply, with the same knowledge document being carried up each step and finally handed to a factory at the top right. Caption beneath: the ability to learn depends on what is already known.

Make-or-buy as technology strategy

Which parts of a technology a firm develops in-house and which it sources is a strategic choice about where its distinctive capability should sit, not only a transaction-cost calculation. Coase (1937) and Williamson (1985) gave the economics (see the economics page); in technology strategy the added consideration is that outsourcing a component can hollow out the capability a firm will need for the next generation. We read this in battery-swap architecture in Own the Battery, Rent the Shopfront and in what an incumbent carries into a new regime in The Incumbent's Second Life.

Timeline diagram: a factory today branches into two paths. Upper 'make' branch shows two engineers at a computer with a stack of books, labelled 'higher effort now', leading right to a fully rendered next-generation robot labelled 'capability retained'. Lower 'buy' branch shows a signed contract and a delivery truck, labelled 'lower effort now', leading right to a dashed outline of a missing robot labelled 'capability hollowed out'. A warning bracket beneath the lower branch reads 'the outsourced component becomes the missing knowledge'. Caption beneath: make-or-buy also decides what the firm will know tomorrow.

The qualification barrier

To sell into a demanding buyer's supply chain, a producer's output must be qualified, certified as fit, and qualification, not the technology or the capital, is often the true gate to a market. This is where appropriability meets the field: the complementary asset the innovator most often lacks is acceptance by the buyer. Drawn out for battery-precursor material in The Lock-In Runs Both Ways and for export policy in The Ban Is Not the Policy.

Line-art sequence: a factory produces a component that passes through two open gates labelled 'technology works' and 'capital available', then meets a red stop sign labelled 'the true barrier', then a taller closed gate labelled 'qualification' with three tags attached, testing, certification, buyer acceptance. Beyond it, warehouses and a delivery truck marked 'market access'. Caption beneath: being able to make it is not the same as being allowed to sell it.

The incumbent's advantage in the next regime

When a transition arrives, the incumbent is not always the loser. A firm that carries transferable capability, distribution, relationships, or process skill into the new regime can win it, which is why some petrol-era players thrive in electric mobility. Reading what actually transfers, and what does not, is the strategic question. Set out in The Incumbent's Second Life.

Diagram: a coral 'old regime' factory with a fuel pump on the left, feeding six capability blocks up a bracket labelled 'transferable capability'. Four green blocks, distribution, customer relationships, process discipline, service network, pass through a central filter labelled 'what transfers?' and re-emerge on the right, feeding a blue 'new regime' factory with a battery and electric motor. Two coral blocks, combustion expertise and fuel infrastructure, are diverted down to a dashed box labelled 'obsolete'. Caption beneath: the incumbent survives when its useful capabilities outlive its technology.

Modularity and the mirroring hypothesis

How a product is divided into components shapes how the industry that makes it is divided into firms. Baldwin and Clark (2000) showed that modularity, splitting a system into parts that connect through standard interfaces, lets different firms innovate on different modules independently, which speeds progress but also lets the value migrate to whoever controls the parts that matter. The related mirroring hypothesis holds that the structure of an organisation tends to mirror the architecture of the product it builds. For a transition this is decisive: modularising a technology (battery, motor, controller, chassis as separable parts) opens it to new entrants and reshuffles who captures the value, which is often the real contest behind an apparently technical standards choice.

Two rows. Top row labelled 'product architecture': four connected modules in sequence, battery (yellow), motor (coral), controller (blue), chassis (green), each linked to the next by interface pins. Bottom row labelled 'industry structure': four firm buildings in the same colours, each dotted-linked up to the module above it, labelled battery firm, motor firm, controller firm, chassis firm. A bracket above the controller module reads 'value can migrate to the controlling module'. Caption beneath: organisation mirrors architecture.

Open innovation

Firms once did their research behind closed doors and commercialised only what they invented; increasingly, valuable knowledge flows across the firm's boundary in both directions, and the task is to manage those flows rather than seal them. Chesbrough (2003) called this open innovation. It matters for transitions because the knowledge a niche needs is usually scattered across many actors, universities, suppliers, users, rivals, and the players who assemble it fastest, rather than the ones who guard their own, tend to set the pace. Closed strategies that worked in a stable regime often fail in the open, fast-moving early phase of a transition.

Two panels side by side. Left panel 'closed innovation': a walled firm doing internal research feeds only into its own market; universities, users, suppliers and other firms sit outside in grey, disconnected. Footer: knowledge stays inside the firm. Right panel 'open innovation': the same four external actors, universities, users, suppliers, other firms, each connected by bidirectional arrows to the firm's internal research, which combines with them into an assembled-knowledge puzzle, which then feeds both the firm's own market and an external market via a globe. Footer: knowledge moves in both directions. Caption spanning both: the strategic task is to manage flows, not seal the boundary.

4. Diffusion and adoption

Diffusion of innovations

An innovation spreads through a population not all at once but in a predictable sequence, innovators, early adopters, early and late majority, laggards, each group persuaded by different things. Rogers (1962) mapped this, and the practical lesson is that the tactics that win the early adopters are not the ones that win the majority; many innovations stall precisely at that handover. Reading where an innovation sits in its diffusion curve tells you who to convince next, and how. The adopter-behaviour reading of the same curve, why the enthusiast is not representative of the majority, is on the human side of technology page.

S-curve chart titled 'Diffusion changes who must be convinced'. Cumulative adoption on the y axis, adopters over time on the x axis. Five coloured segments beneath the curve label the adopter groups left to right: coral innovators, yellow early adopters, sky-blue early majority, sage late majority, forest laggards. A short vertical dashed pair marks 'the chasm' between early adopters and early majority. A dot on the rising curve is labelled 'mainstream adoption'. Two brackets above the curve read 'vision, novelty, tolerance for rough edges' on the left and 'reliability, proof, compatibility' on the right.

The chasm between early adopters and the majority

The gap between the visionaries who will tolerate a rough product and the pragmatists who will not is where many technologies die. The named form, Moore's chasm, has been the language of technology marketing for three decades. The early market and the mainstream market want different things, and a product tuned to the first can fail to cross to the second. In a transition, this chasm is often the real barrier, not the technology and not the price, but the leap from the enthusiasts to the ordinary user.

Increasing returns to adoption

Some technologies get more valuable the more they are adopted: each user improves the infrastructure, deepens the skill base, and raises the option's credibility for the next user. Arthur (1989) formalised this (see the economics page for the economic treatment); in innovation dynamics it is the engine that lets a niche cross the chasm and eventually overtake an incumbent, and the reason the early going is so slow.

Adoption is not a switch

Real adoption is rarely a clean replacement. Users add the new technology alongside the old, keep the incumbent as backup, and shift gradually, so a diffusion curve hides a messier reality of stacking and partial use. We read this pattern in African solar in Stacking, Not Switching.

Enough demonstrations

Once a technology is proven, further pilots do not advance it; the binding constraint moves from demonstrating that it works to scaling it, and scaling is a different discipline from proving. Mistaking the two keeps a technology stuck in a permanent pilot phase. Argued for European agriculture in Europe Has Enough Demonstrations.


5. The bridge to socio-technical transitions

The transitions literature scales the same questions up to whole systems, energy, mobility, food, where the "technology" is a regime of infrastructure, institutions, and behaviour, and the "firm" is a society.

Three stacked coloured bands. Top yellow band labelled 'landscape, pressures the system' with icons for prices, policy and a storm. Middle coral band labelled 'regime, the established system' with factory, government building and clipboard. Bottom sky band labelled 'niche, novelty develops here' with a small greenhouse containing solar panel and battery. A red arrow from landscape presses down on regime; a blue arrow from niche pushes up into regime. Beneath, a forest-green panel labelled 'BReW: how the niche engages the barrier' splits into three cells: Bypass (a solid square dashed to a hollow one), Repurpose (factory arrows to solar and battery), Weaken (a full column reduced to a partial one). Caption beneath: levels describe the system; BReW identifies the field strategy.

The multi-level perspective

Transitions are read across three levels: protected niches where novelty incubates, the incumbent regime that resists it, and a broad landscape of prices, politics, and crises that can shake the regime loose. Geels (2002), building on Rip and Kemp (1998), gave this the multi-level perspective, now the dominant frame in transition studies. It is the systems-level version of the niche-versus-incumbent contest that innovation dynamics studies at the firm level.

Strategic niche management

New technologies need protected spaces to mature before they can face the regime, and those spaces can be deliberately created and managed, through pilots, subsidies, and shielded markets, to build the networks, expectations, and learning a niche needs. Kemp, Schot, and Hoogma (1998) called this strategic niche management. It is the transitions-scale version of nurturing an innovation through its fragile early phase.

Transition pathways

A transition can unfold in several shapes depending on the timing of landscape pressure and the readiness of the niche: substitution, transformation, reconfiguration, or de-alignment and re-alignment. Geels and Schot (2007) set out these pathways. Reading which pathway a transition is on changes what a niche should do, and the Lab's own four-ways-a-transition-lands diagnostic is a field-oriented cousin of this map.

The BReW framework, in this lineage

The Lab's own Bypass, Repurpose, Weaken framework sits in this tradition. Where the multi-level perspective describes the levels and the pathways describe the shapes, BReW classifies the mechanism by which a specific niche strategy engages a specific regime barrier, the operational, field-testable layer beneath the broader theory. It is innovation dynamics made diagnostic.


References

The concepts above draw on the following canonical sources in the management-of-technology, innovation-studies, and socio-technical-transitions literatures.

Abernathy, W. J., and Utterback, J. M. (1978). Patterns of industrial innovation. Technology Review, 80(7), 40 to 47.

Adner, R. (2006). Match your innovation strategy to your innovation ecosystem. Harvard Business Review, 84(4), 98 to 107.

Arthur, W. B. (1989). Competing technologies, increasing returns, and lock-in by historical events. The Economic Journal, 99(394), 116 to 131.

Baldwin, C. Y., and Clark, K. B. (2000). Design Rules, Volume 1: The Power of Modularity. Cambridge, MA: MIT Press.

Bresnahan, T. F., and Trajtenberg, M. (1995). General purpose technologies: 'Engines of growth'? Journal of Econometrics, 65(1), 83 to 108.

Chesbrough, H. W. (2003). Open Innovation: The New Imperative for Creating and Profiting from Technology. Boston: Harvard Business School Press.

Christensen, C. M. (1997). The Innovator's Dilemma: When New Technologies Cause Great Firms to Fail. Boston: Harvard Business School Press.

Coase, R. H. (1937). The nature of the firm. Economica, 4(16), 386 to 405.

Cohen, W. M., and Levinthal, D. A. (1990). Absorptive capacity: A new perspective on learning and innovation. Administrative Science Quarterly, 35(1), 128 to 152.

David, P. A. (1985). Clio and the economics of QWERTY. American Economic Review, 75(2), 332 to 337.

David, P. A. (1990). The dynamo and the computer: An historical perspective on the modern productivity paradox. American Economic Review, 80(2), 355 to 361.

Dosi, G. (1982). Technological paradigms and technological trajectories. Research Policy, 11(3), 147 to 162.

Foster, R. N. (1986). Innovation: The Attacker's Advantage. New York: Summit Books.

Geels, F. W. (2002). Technological transitions as evolutionary reconfiguration processes: A multi-level perspective and a case-study. Research Policy, 31(8-9), 1257 to 1274.

Geels, F. W., and Schot, J. (2007). Typology of sociotechnical transition pathways. Research Policy, 36(3), 399 to 417.

Henderson, R. M., and Clark, K. B. (1990). Architectural innovation: The reconfiguration of existing product technologies and the failure of established firms. Administrative Science Quarterly, 35(1), 9 to 30.

Katz, M. L., and Shapiro, C. (1985). Network externalities, competition, and compatibility. American Economic Review, 75(3), 424 to 440.

Kemp, R., Schot, J., and Hoogma, R. (1998). Regime shifts to sustainability through processes of niche formation: The approach of strategic niche management. Technology Analysis & Strategic Management, 10(2), 175 to 198.

Rip, A., and Kemp, R. (1998). Technological change. In S. Rayner and E. L. Malone (Eds.), Human Choice and Climate Change (Vol. 2, pp. 327 to 399). Columbus: Battelle Press.

Rogers, E. M. (1962). Diffusion of Innovations. New York: Free Press.

Schumpeter, J. A. (1942). Capitalism, Socialism and Democracy. New York: Harper & Brothers.

Teece, D. J. (1986). Profiting from technological innovation: Implications for integration, collaboration, licensing and public policy. Research Policy, 15(6), 285 to 305.

Teece, D. J., Pisano, G., and Shuen, A. (1997). Dynamic capabilities and strategic management. Strategic Management Journal, 18(7), 509 to 533.

Utterback, J. M., and Abernathy, W. J. (1975). A dynamic model of process and product innovation. Omega, 3(6), 639 to 656.

Williamson, O. E. (1985). The Economic Institutions of Capitalism. New York: Free Press.


Reading further

Understanding how a technology evolves is what lets us read, in the field, whether a specific deployment is riding its curve or about to be overtaken, setting the dominant design or chasing someone else's, building the capability to last or hollowing it out. See What We Do, the economics of transitions, and the transitions primer.

Back to Resources See all resources → Read alongside The Economics of Transitions Allocation and welfare view →

The Lab is an independent research team, not an advocacy organisation. We do not campaign, endorse products, or accept commissions where a finding is expected in advance. Where a partner's own theory of change is what needs testing, that is a legitimate engagement, and the Lab tests it honestly.